Welcome starting a build log for my next panzer build.
There was a demand of a close-support Howitzer carriage for the infantry. In fact, it was a request from reports during the campaign of Poland, which highlighted the lack of heavy artillery support, unable to cope with the fast pace of panzers. And so to motorize artillery companies meant that a strong, armoured self-propelled carriage was needed. The panzer I was obsolete so a new panzer was born.
The standard sIG 33 150 mm field Howitzer was mounted via ramps on two receiving rails with fixations, and two "baskets" for each wheel, which held the entire gun, on the top of the chassis, with its upper hull and turret removed. This configuration allowed the gun to be put in place and also retired quickly.





All Ive got the energy for now. Update soon with spruces and build.

























